Repipe 2 story 5 bath slab foundation home with Pex A pipe. Repipe 23 fixtures and 9 hose bibbs. Provide and install 1.25 " regulator with ball valve. Patching, texture, permit and inspections included.
Enter the destination URL
Or link to existing content