Repiped a 2 story, 4 bathroom slab foundation house with Pex A pipe. Repiped 14 fixtures and 4 hose bibbs. Provided and installed 1" regulator with new ball valve. Dry wall patching, texture, city permit, and city inspections included.
Enter the destination URL
Or link to existing content