Repipe 2 story 4 bath slab foundation home with Pex A pipe. Repipe 18 fixtures and 3 hose bibbs. Provide and install 1.25" regulator with ball valve. Patching, texture, permit and inspections include.
Enter the destination URL
Or link to existing content